FAIL (the browser should render some flash content, not this).
Facility Equipment Location

Facility

American Environmental Landfill is constructed of one foot clay liner, Geosynthetic Clay Liner (GCL), 60 mil HPPE Liner, Geo-Net, Leachate collection system, two feet sand blanket and a special interceptor water line to ensure water is kept away from the landfill.

 

 

 

AEL’s multiple scales provide easy and quick access to dispose of incoming waste and keeps the premises secure.  Each scale can weigh up to 200,000lbs.

 

 

 

 

In order to keep AEL’s exits and local public roadways clear from mud and dirt there is a wheel washer in operation keeping America beautiful and leading the industry in environmental compliance.

 

 

 

With the installation of the wheel washer and the latest technology in liners, a leachate collection system, and an interceptor line around the landfill keeping water from going beneath the landfill, AEL has been named the number one operating landfill according to the Oklahoma Department of Environmental Quality (DEQ). 

 
Copyright 2005-2006 © American Environmental Landfill. All rights reserved.